BC Strata Electrical Planning Report & EV-ready report

What’s new (B.C. EPR deadlines)

 Strata corporations in British Columbia with 5+ lots must obtain an Electrical Planning Report (EPR).
Deadlines:

  • Dec 31, 2026 – Metro Vancouver, Fraser Valley, and Capital Regional District (excluding islands only reachable by air/boat).
     
  • Dec 31, 2028 – All other B.C. regions (including Southern Gulf Islands and Bowen Island).
     
  • New stratas: 5 years from deposit of the strata plan.
     

An EPR helps councils plan for EV charging, heat pumps, domestic hot water electrification, and other new electrical loads—before capacity becomes a bottleneck.

EV-Ready Plan (turn your EPR into action)

 An EV-Ready Plan converts your EPR findings into a buildable roadmap so every dwelling can access at least one EV-ready stall while controlling costs.

What you get:

  • Load-management strategy to maximize existing service capacity (often avoiding panel or service upgrades).
     
  • Infrastructure design (wiring, raceways, panels, network) that fits your building type and budget.
     
  • Tender-ready scope & cost estimate to get comparable quotes from contractors.
     
  • Rebate navigation so you capture available BC Hydro / FortisBC funding and any municipal top-ups.
     
  • Council-friendly package to streamline approvals and owner communications.

Heat pumps: why residents ask for them

  •  Heating + cooling from one efficient system (quieter, safer than baseboards or gas furnaces).
     
  • Lower operating costs and better comfort during heat events.
     
  • Future-proofing for building decarbonization goals.
     
  • Plays nicely with your EPR/EV load plan—we size and schedule loads so you don’t blow past capacity.

electrical planning report / ev-ready report

Incentive snapshot (as of 2025; funding limited)

 For strata common areas in B.C. (program rules apply):

  • EV-Ready Plan: 75% up to $3,000 per complex.
     
  • EV-Ready infrastructure: 50% up to $600 per stall, up to $120,000 per complex.
     
  • Level 2 chargers: Up to 50% to $2,000 per charger (or $1,400 if you claimed EV-Ready infrastructure), max $14,000 per complex.
     
  • FortisBC Electric areas: Additional $1,920 per charger (up to 7 per site).
    We’ll handle the paperwork and timing so your strata doesn’t miss out.

Consequences of not complying

  •  Legal risk: Missing the EPR deadline violates the Strata Property Act/Regulations.
     
  • Insurance exposure: Unknown/ungoverned electrical loads can trigger underwriting concerns and higher premiums.
     
  • Sales & financing friction: Form B must disclose whether an EPR exists—no report can spook buyers and lenders.
     
  • Rush costs & lost funding: Leaving it to late-2026/2028 = contractor bottlenecks, higher prices, and empty rebate buckets.
     
  • Operational risk: Unplanned loads raise the chance of brownouts and surprise service upgrades.


Copyright © 2026 Maben Consulting - All Rights Reserved.

Powered by

  • Contact

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept