2026 Deadline Approaching

BC Electrical Planning Reports & EV-Ready Plans

Ensure compliance, manage future electrical loads, and unlock government rebates with expert EPR services from certified professionals.

Certified Professionals
Part 3 & 9 Buildings
BC-Wide Service
Electrical engineer inspecting electrical panel for EPR assessment

Is Your Strata Ready?

Dec 31, 2026 Deadline

Metro Vancouver, Fraser Valley, Capital Regional District

Dec 31, 2028 Deadline

All other BC regions (including Southern Gulf Islands, Bowen Island)

New Stratas

5 years from deposit of strata plan

Why Compliance Matters

Missing the EPR deadline violates the BC Strata Property Act and can create serious risks for your strata corporation.

Legal Risk

Non-compliance violates Strata Property Act regulations

Form B Disclosure

Must disclose EPR status—no report can spook buyers and lenders

Rush Costs

Late compliance means contractor bottlenecks and empty rebate buckets

Brownouts

Unplanned loads raise risk of power issues and surprise upgrades

Our Services

Comprehensive electrical planning solutions for BC strata corporations

Electrical Planning Report (EPR)
Mandatory assessment for all BC stratas with 5+ lots

An EPR provides a high-level overview of your building's electrical capacity and helps councils plan for EV charging, heat pumps, domestic hot water electrification, and other new electrical loads—before capacity becomes a bottleneck.

What's Included:

  • Current electrical capacity assessment
  • Peak demand and spare capacity analysis
  • Future electrical needs projection
  • Demand management recommendations
  • Permanent strata record for Form B disclosure
EV-Ready Plan
Turn your EPR into an actionable roadmap

An EV-Ready Plan converts your EPR findings into a buildable roadmap so every dwelling can access at least one EV-ready stall while controlling costs.

What You Get:

  • Load-management strategy to maximize existing capacity
  • Infrastructure design (wiring, raceways, panels, network)
  • Tender-ready scope & cost estimate
  • Rebate navigation (BC Hydro / FortisBC funding)
  • Council-friendly package for approvals
Cost Savings: Bundle with EPR

Our Process

A simple, transparent process from consultation to delivery

1

Initial Consultation

We discuss your strata's needs, building type, and timeline requirements

2

Site Visit & Data Collection

Our certified professionals inspect electrical systems and gather necessary data

3

Analysis & Report Generation

We analyze capacity, project future needs, and prepare comprehensive documentation

4

Delivery & Review

Receive your report with clear recommendations and rebate application support

Senior engineer reviewing plans at construction site

Why Choose Maben Consulting

Expert electrical planning services you can trust

Certified Professionals

Our reports are prepared by qualified electrical engineers and applied science technologists as required by the BC Strata Property Act for both Part 3 and Part 9 buildings.

Long-Term Value

Electrical equipment lasts 40-45 years. We help you size it right and do it once, avoiding costly retrofits and ensuring your investment serves your strata for decades.

Maximize Rebates

We handle the paperwork and timing to ensure your strata captures all available BC Hydro and FortisBC funding—up to $137,000 per complex.

BC Hydro & FortisBC Rebates

Significant funding available for strata common areas (as of 2025; funding limited)

Up to $3,000
EV-Ready Plan

75% of costs per complex

Up to $120,000
EV-Ready Infrastructure

50% up to $600 per stall

Up to $14,000
Level 2 Chargers

50% up to $2,000 per charger (or $1,400 if infrastructure rebate claimed)

$1,920
FortisBC Electric Areas

Additional per charger (up to 7 per site)

Total potential funding: Up to $137,000 per complex | We'll handle the paperwork and timing so your strata doesn't miss out.

Frequently Asked Questions

Everything you need to know about EPR and EV-Ready Plans

Get Your Free Quote

Contact us today to discuss your strata's EPR and EV-Ready Plan needs

Or contact us directly: